The beginning of the Crawling Stone Line marked the first determined effort under President Bucks, while undertaking the reconstruction of the system for through traffic, to develop the rich local territory tributary to the mountain division. New policies in construction dated from the same period. Glover, with an enormous capital staked for the new undertakings, gave orders to push the building every month in the year, and for the first time in mountain railroad-building winter was to be ignored. The older mountain men met the innovation as they met any departure from their traditions, with curiosity and distrust. On the other hand, the new and younger blood took hold with confidence, and when Glover called, "Yo, heave ho!" at headquarters, they bent themselves clear across the system for a hard pull together.
McCloud, resting the operating on the shoulders of his assistant Anderson, devoted himself wholly to forwarding the construction plans, and his first clash over winter road-building in the Rockies came with his own right-hand man, Mears. McCloud put in a switch below Piedmont, opened a material-yard, and began track-laying toward the lower Crawling Stone Valley, when Mears said it was time to stop work till spring. When McCloud told him he wanted track across the divide and into the lower valley by spring, Mears threw up his hands. But there was metal in the old man, and he was for orders all the time. He kept up a running fire of protests and forebodings about the danger of exposing men during the winter season, but stuck to his post. Glover sent along the men, and although two out of every three deserted the day after they arrived, Mears kept a force in hand, and crowded the track up the new grade as fast as the ties and steel came in, working day in and day out with one eye on the clouds and one on the tie-line and hoping every day for orders to stop.